a full-service drainage improvement firm

STREAMBANK STABILIZATION

 

 


Issue:

A small creek through an easement was eroding into the foundation base of an existing stone retaining wall.

 

Remedy:

Direct flow of water to the outside bend of the creek channel to increase silt build-up along the stabilized bank.


Construct bank stabilization. Backfill retained area with Gabion rock fill (3"-8” rock)


Cover Gabion fill with 2” gravel for a walkway along the edge of the creek and wooded area.

Contact Forest Landworks by email.