Issue:
A small creek through an easement was eroding into the foundation base of an
existing stone retaining wall.

Remedy:
Direct flow of water to the outside bend of the creek channel to increase silt
build-up along the stabilized bank.
Construct bank stabilization. Backfill retained area with Gabion rock
fill (3"-8” rock)

Cover Gabion fill with 2” gravel for a walkway along the edge
of the creek and wooded area.

Contact Forest Landworks by email. |