a full-service drainage improvement firm

EROSION DAMAGE

 

 

 

Issue:
Approximately five acres of vacant ground was draining toward the crest of the high bank. During seasonal rains, a river flowed through the property below.

Remedy:
Stabilize the eroded ditch with stone and re-direct the water to a suitable location.

After heavy rains, the owner of this property enjoyed seeing the river flow, rather than watching their property wash onto the public roadway.


Contact Forest Landworks by email.